PAST PROJECTS

Past Projects

With over forty-one years of projects we have too many to list here but we will highlight a selection that shows our versatility as well as our capabilities.

Anlin Window Systems

Phase I & II
185,000 sq. ft. concrete tilt-up, wood frame manufacturing and office building. Included coordination with several facility vendors in layout and installation of manufacturing equipment. Project involved site development consisting of yard, equipment storage and parking with open space for their large manufacturing operation.

Location:
1665 Tollhouse Road
Clovis, CA
Website: www.anlin.com

Grunfos Pumps Inc

Executive Headquarter & Manufacturing
Fortune-Ratliff constructed six major phases of construction on two sites for Grunfos Pumps, Inc. The last four phases was at their North American Headquarters state of the art manufacturing facility, sales and corporate offices located in Clovis, California. This facility is located on a 37 acre site. The buildings are constructed of concrete tilt-up walls with steel roof, structural steel frames and glass curtain walls. Total Building Construction 275,000 sf.

Location:
5900 E. Shields Ave.
Fresno, CA
Website: www.grundfos.com

Coca Cola

Distribution Centers
Four major distribution center projects for Coca Cola, consisting of two addition/remodels and two new facilities. The remodels are located in Las Vegas, NV and Fresno, CA. in both facilities the additions nearly doubled the size of the original facility. New facilities located in Santa Maria and Bakersfield California, varied from concrete tilt-up to steel building with a hy-brid of tilt-up and steel construction on the Bakersfield building. All site improvements including underground utilities, heavy truck paving, loading docks and landscaping were included as part of the work.

Location:
Fresno, Las Vegas, Bakersfield, Santa Maria

BMW of Fresno

A full design-build project that combined the use of steel panel, plaster and high efficiency glass exterior finishes over a 15,000 square foot steel structure. The facility is further augmented with ultra modern interior finishes including stainless steel cabinet work, ultra high efficiency LED lighting and polyester epoxy resin floor coatings. The project was a fast track schedule that required several challenging deadlines to be met in order to achieve financial milestones for the owner.

Location:
5615 E. Westover
Fresno, CA 
Website: www.bmwoffresno.com

SOME OF OUR RECENTLY COMPLETED PROJECTS

New Exployer Cabins at Tenaya Lodge & Site Improvements, a 50 cabin development with complete 27 acre site infrastructure and HWY 41 road widening. Construction progressed through the winter and was completed for the owners Grand Opening. 
Grant Grove New Restaurant, was constructed after complete demo of the existing Restaurant at the Visitors Center in Kings Canyon National Park. The new restaurant is a 8,000 SF heavy timber wood framed building with exposed strucutral steel trusses, wrapped in finished wood. The building was cerified LEED Gold for the sustainable material used and energy efficient MEP operating systems. 
Armenian Genocide Memorial Monument at CSU, Fresno 
Badger Pass Ski Lodge Deck Replacement, Yosemite National Park 
Samoa Ave. Apartments, Tujunga, CA. 
National Environmental Science Center, Yosemite West, CA. 
PAST HIGHLIGHTED PROJECTS 

Additional Past Projects

Share by: