Fortune-Ratliff has constructed five Rite Aid’s; four new buildings and one remodel of an existing building. Construction of exteriors varied from wood frame with single coat hi-tech plaster material, concrete block and wood frame with standard 3-coat plaster system. Each building was approximately 17,000 sf. plus site development.
Baird Middle School
Building/Site
18,460 SF
Project Scope
The project consist of adding a new gymnasium building to the existing campus. The gymnasium accommodates an exercise room, locker rooms, toilets and corresponding support rooms.
Project Location
5500 North Maroa Ave., Fresno, California
Mountain Broiler & Garden (Restaurants), Plus Nature Shop
Wood frame added to existing steel structure. Exterior glass wall, resawn timbers, siding, copper gutters and comp. roof, interior, Clear Hart Cedar Wood 2×10. Building also equipped with computerize control dimming panel lighting systems.
Location:
Yosemite National Park, California 95389
60,000 sq. ft. concrete tilt up constructed auto sales and service facility. Wood frame sales and administrative areas and partial roof structure. Included concrete roof-top parking utilized for auto inventory storage.
Location:
895 W. Shaw Avenue
Clovis, CA
Office & Distribution
Spanish Style Corporate Office and Cold Storage facility in Santa Maria, CA. The cold storage/shipping facility is a 90,000 sf. concrete tilt-building and the corporate office is 10,000 sf. two story wood framed, plaster tile roof separate building.
A 30,000 sf. addition to the cold storage facility and a corporate office expansion. Also constructed the initial site development work consisting of underground utilities, road way, street lights, cubs, gutters and landscaping.
Location:
850 W. Stowell Road
Santa Maria, CA
Remodel of 52 rooms in five different buildings for the Yosemite Lodge in Yosemite Valley, Yosemite National Park.
Hamilton Elementary Modernization
Project Location
102 E. Clinton, Fresno, CA 93704
Project Scope
Interior Modernization of various existing campus
Buildings plus HVAC equipment replacement and associated electrical improvements plus extensive accessibility site improvements.
Wuksachi Lodge is beautifully crafted of cedar and stone, highlighted by stone fireplaces, natural woods, and panoramic views of the surrounding forest and High Sierra peaks. Built in 1999 and highlighted by a spectacular mountain/forest setting, the Wuksachi Lodge is an upscale mountain resort featuring 102 spacious guest rooms, a full-service restaurant serving sumptuous Sierra Alpine cuisine, cocktail lounge, retail and ski shop, and dedicated special event facilities.
Location:
64740 Wuksachi Way
Sequoia National Park, CA 93262
Sunrise Medical
Building/Site
48,000 SF ON 3.5 Acres
Type of Construction
Poured in place foundation, slabs & walls with
majority of walls being pre-cast concrete panels.
Panelized and Built-up roof structure.
Unique Features
Round clerestory towers and fluted, ribbed
Concrete wall finishes laid out in a special design pattern.
Poured in place foundation, slabs & walls with majority of walls
being pre-cast concrete panels. Panelized and Built-up roof structure.
1985 PREVIEW FRESNO AWARD WINNER
Project Location
2842 Business Park Avenue, Fresno, California
12,544 Sq.Ft. Office Building
Featuring Armstrong “Serpentina” decorative ceiling systems at lobby, conference room, and work area. Velux skylights with motorized heat block shades, and custom design lighting package.
Yamabe & Horn Engineering, Inc. is a professional service civil engineering and land surveying firm established 1979.
Location:
2985 N. Burl Ave., Suite 101
Fresno, CA
Building/Site
Site: 6.5 Acres – 163,000 sq. ft
Construction consists of;
Congregate Living Facility with Central
Corridors and Elevators, Swimming Pool,
and Spa. Large Community shared areas and salon.
Unique Features
Building with Commercial Kitchen,
Dining Facility, Activity, Beauty/Barber areas, Poured In Place Concrete Foundation and Slab. Exterior Walls & Second Floor Wood Construction. Tile Roof.
Plaster Exterior.
Project Location
1715 E. Alluvial, Fresno, California
BUILDING/SITE
9,000 SF ON 1 1/2 Acres
TYPE OF CONSTRUCTION
Custom Design, Wood Frame, Stucco, Tile Roof
UNIQUE FEATURES
Theater Room, Whole House System
Classic Poker/Bar Room, Exquisite Wood-Iron
Railings, Gourmet Kitchen, Resort-Type
Pool, Batting Cage, Inside/Out Waterfalls
PROJECT LOCATION
Bullard Neighborhood, FRESNO, CALIFORNIA
8500 sq. ft. sanctuary remodel including new finishes and architectural features throughout. Finishes included extensive wood and acoustic paneling.
Location:
5415 N. West Avenue
Fresno, CA
Tanager Springs
172,410 Sq. Ft. apartment complex with 154 units wood frame stucco and tile roof.
Tanager Springs affordable housing units in Fresno, California include Club House, Controlled Access, Courtyard, Covered parking, Disability Access, Patio or Balcony, Playground, Pool, and more!
Location:
2121 South Maple
Fresno, CA
Campus Baptist Church
This 25,000 sf. multi-purpose building was a welcome addition to the church campus. Construction is two story wood frame structure with plaster and stone exterior.
Location:
4710 N. Maple Avenue
Fresno, CA
Betts Spring Company
125,162 s.f. Manufacturing, Distribution and Office Facility.
This project was tilt-up concrete construction housing Betts Manufacturing and distribution operations with two story corporate and administrative offices. The site-work consisted of loading docks, underground utilities, landscaping site concrete and heavy truck traffic asphalt paving section.
Location:
2867 S. Maple Ave.
Fresno, CA
Building/Site
11,600 SF Multi-purpose building for the Big Sandy Racheria community.
Project Location
33041 Auberry Road, Auberry, CA 93602